Typology 01 · Production Ready · Mumbai Commercial Installations
Section 01 & 03 · Platform Mechanics

The Wall Surface That Opens.
Zero Dust. Zero Trades. Zero Downtime.

Every cable, conduit, and connection behind the elevation stays reachable for the life of the building. Unclip, route, and reclip in under 3 minutes — eliminating cutting, patching, sanding, and repainting.

Launch 3-Move Demount Simulator Anatomy of the Cavity
Section 03 · Toolless Operation Simulator

01 Access in Three Moves

Patented WallClick Node Engagement

Repeatable toolless engagement that leaves zero trace of maintenance works. Click the step controls below to simulate the physical uncoupling and snap-indexing of the 500 × 500 mm cassette.

STEP 01 — RELEASE: Press & Disengage

Technician applies calibrated inward pressure (180 N) to release the concealed spring clips without face tools, suction lifters, or pry bars. Surrounding panels remain 100% undisturbed.

Calibrated Force Gauge
180 N Calibrated Inward Pressure
Alignment True Position
±0.00 mm (Locked in Grid)
SUBSTRATE & CONCEALED SUB-FRAME TIER 01: 230V Mains & UPS TIER 02: Cat6A / Fiber Conduits TIER 03: 45 kg/m³ Acoustic Infill TIER 04: Negative Pressure Airflow 230V RJ45 500 × 500 mm CASSETTE Patented WallClick Interface
Interactive mechanical assembly — WallClick spring detent & multi-tier raceway
Attribute 01

100% Toolless Operation

No suction lifters, allen keys, or pry bars needed. One-handed calibrated push-release.

Attribute 02

Isolated Removal

Surrounding panels remain fully undisturbed. Swap coordinates or replace damaged tiles in seconds.

Attribute 03

Vibration Dampened Interface

EPDM elastomeric isolation rings on all nodes eliminate acoustic flanking transmission and panel rattle.

Section 04 · Cavity Engineering

02 Anatomy of the Continuous Cavity

Zone-Configured Standoff Depth: 50 mm to 220 mm

Panels stand clear of the substrate on adjustable standoffs, creating a continuous, ventilated raceway behind the finished elevation. This cavity organizes power, high-speed data, HVAC distribution, and acoustic absorption into isolated rails rather than burying them haphazardly inside studs.

Multi-Tier Raceway Segregation Architecture:

TIER 01 · POWER (230V Mains & UPS)

Grounded metallic raceway isolating high-voltage lines from data interference with continuous EMI barrier.

Universal Frame-Free Grid Mounting

The identical cold-rolled aluminum sub-frame rail mounts acoustic fluted tiles, living bio-cassettes, and illuminated panels interchangeably on the same node geometry.

50–220 mm Adjustable Standoff continuous service cavity flush outlet in face demountable tile
Plan Section · Standoff & Multi-Tier Raceway Architecture
Section 05 · Technical Parameters

03 JOMETRY Service Wall Specification

BIM Revit 2026 Ready
Parameter Standard Specification Project Options
Module Dimensions 500 × 500 mm precision cassette (30 mm profile) Custom dimensions up to 1200 × 600 mm
Mounting Methodology Patented WallClick Node (Die-Cast Zinc & SS304) Marine Grade Plastic / Aluminum
Standoff Range 50 mm to 220 mm adjustable depth from substrate Custom offsets up to 350 mm for deep MEP
Raceway Capacity Dual-rail power/data segregation with EMI barrier Triple-chamber optical & medical gas trunking
Face Typologies Solid matte, fluted ribbed, slotted acoustic, perforated Natural wood veneer / Anodised architectural metal
Healthcare Variant Seamless antimicrobial wipeable finish (ISO Class 5) Hermetically gasketed shadow lines
Hardware Integration Flush switch plates, Cat6A RJ45, USB-C PD, HDMI AV Factory CNC precision openings
Cycle Durability Rated >500 toolless demount cycles without mechanical play Lifetime structural platform warranty
Fire Classification Class 1 / Class A flame spread rated (ASTM E84 / EN 13501) BS 476 Part 6 & 7 Compliant
Acoustic Isolation STC 48–54 with cavity infill and isolation gaskets Tested to ISO 10140 / ASTM E90
CSI MASTERFORMAT™: Div 09 22 00 · Div 10 22 19 · Div 27 11 00
DWG / BIM Revit 2026 Ready